• Facebook
  • OSPI on Twitter
  • OSPI Medium
  • OSPI LinkedIn
  • OSPI YouTube
  • OSPI on Flickr
  • Subscribe to OSPI GovDelivery

You are here

Home » misc pages don't get lost » Bulletins by Programs » Bulletins/Memos: School Facilities & Organization

Bulletins/Memos: School Facilities & Organization

Numbersort ascending Date Title File(s) Office Program
M064-15 11/05/2015 Information regarding the 2015-17 Capital Budget appropriation for STEM Grants The Office of Superintendent of Public Instruction (OSPI), School Facilities & Organization staff will conduct a K-20/Go to meeting briefing on Tuesday, November 17, at 1:00 p.m. to provide details about the 2015-17 Capital Budget funding for STEM grants.
M057-15 10/06/2015 K-3 Class Size Reduction Grant Applications & 2nd K-20 Training Opportunity A K-20 videoconference is scheduled for October 16 from 9:00-10:30 a.m. Contact Kim Beaulieu at kim.beaulieu@k12.wa.us or 360-725-4953 to sign up for this important training session.
M056-15 09/17/2015 Information regarding the 2015-17 Capital Budget appropriation for Healthy Kids-Healthy Schools Grant The Office of Superintendent of Public Instruction (OSPI), School Facilities and Organization staff will conduct a K-20 network briefing on October 13 from 9-10:30 a.m. to provide details about the 2015-17 Capital Budget funding for Healthy Kids-Healthy Schools grants.
M045-15 08/20/2015 School Capital Funding through the School Construction Assistance Program (SCAP) and Basic Building Condition Assessment (BCA) Training The Office of Superintendent of Public Instruction (OSPI) is offering an all-day training opportunity for school district administrative staff to learn about School Capital Funding and Basic Building Condition Assessments.
M029-16 05/19/2016 Substitute HB 2985 - Vacated Schools The 2016 Legislature passed Substitute House Bill 2985 (SHB 2985), which allows school districts to reopen schools previously replaced with state assistance funds for instructional use without penalty under certain conditions.
M024-16 04/29/2016 Lead and Drinking Water in Schools Attached is an informational letter from the Department of Health (DOH) providing guidance and recommendations for testing lead in school drinking water systems.
M014-15 02/11/2015 Draft 2015 Washington Sustainable School Protocol (WSSP) Available for Stakeholder Comments State-funded school building projects greater than 5,000 square feet are required by chapter 39.35 RCW to comply with high-performance, green building requirements.
M011-15 01/22/2015 School Construction Assistance Program (SCAP) Refresher and District Level Building Condition Assessment (BCA) Training The School Facilities and Organization department at OSPI is offering two statewide, all-day training opportunities on two major topics listed below.
M010-15 01/22/2015 SSB 5197 Construction Requirements The 2013 Legislature passed SSB 5197 which amended RCW 28A.335, requiring districts to consider certain design features when constructing or modernizing schools.
B110-18 11/27/2018 Intro to School Construction Assistance Program (SCAP) Trainings The Office of Superintendent of Public Instruction (OSPI), School Facilities and Organization office will conduct three full-day Introduction to SCAP training sessions in early 2019
B109-18 11/27/2018 Certified Building Condition Assessment (BCA) Trainings The Office of Superintendent of Public Instruction (OSPI), School Facilities and Organization will conduct three full-day BCA training sessions in early 2019.
B108-18 11/26/2018 Zero Net Energy Schools Workshop Schools are leading the race to zero net energy (ZNE) construction with over 100 verified and emerging educational buildings across the country.
B057-18 06/21/2018 Career & Technical Education Equipment Grant iGrants Form Package 816 The legislature has appropriated funding in the 2017-19 Capital Budget to provide Career & Technical Education equipment (CTE) grants to school districts. OSPI in consultation with school districts and the Workforce Training and Education Coordinating Board, developed criteria for providing funding and outcomes for specific projects.
B056-18 06/27/2018 STEM Classroom and Lab Grant - iGrants Form Package 855 The 2018 Washington State Legislature appropriated $10 million in capital funding for STEM Capital Grants (SSB6090 Section 5005).
B055-18 07/12/2018 Urgent Repair Grant iGrants Form Package 478 The 2018 Washington State Legislature appropriated $3 million in capital funding for Health & Safety Urgent Repair Grants (SSB6090 Section 5001).
B054-18 07/10/2018 Small Rural District Modernization Grant iGrants Form Package 856 2018 Legislation (ESSB6095 Section 5008) provided $15,419,000 solely for grants to assist small, rural school districts with total enrollments of one thousand students or less with school facilities modernizations.
B053-18 06/27/2018 ADA Equal Access Grant - iGrants Form Package 815 The 2018 Washington State Legislature appropriated $1 million in capital funding for ADA Access Grants (SSB6090 Section 5001)
B052-15 09/17/2015 K-3 Classroom Size Reduction (CSR) Grant Applications The 2015 Legislature passed SSB 6080 as part of the 2015-17 Capital Budget, offering a pilot competitive grant program with funding assistance to add classrooms to help achieve K-3 class size objectives for the 2017-18 school year, as enumerated in RCW 28A.150.260 and RCW 28A.150.315.
B043-19 06/27/2019 Capital-funded Competitive Grant Programs Available to School Districts through School Facilities and Organization The legislature has appropriated funding in the 2019-2021 Capital Budget for facility-related grants to school districts.
B043-15 08/27/2015 SSB 6080 Capital Funding for K-3 Classroom Size Reduction (CSR) Grants The 2015 Legislature passed SSB 6080 as part of the 2015-17 Capital Budget, offering a pilot competitive grant program with funding assistance to add classrooms to help achieve class size objectives for the 2017-18 school year, as enumerated in RCW 28A.150.260 and RCW 28A.150.315.
B034-18 04/27/2018 Capital-funded Competitive Grant Programs Available to School Districts Through School Facilities and Organization. (Addendum added 5/2/18) The legislature has appropriated funding in the 2017-2019 Capital Budget for facility-related grants to school districts.
B016-18 04/05/2018 High-Performance School Buildings Program: Draft 2018 Washington Sustainable Schools Protocol (WSSP) Available for Stakeholder Comments State-funded school building projects greater than 5,000 square feet are required by chapter 39.35 RCW - High Performance Public Buildings to comply with high-performance, green building requirements.
B015-15 04/02/2015 2015 Annual Collection of Building Data is Live On Monday, April 6 the 2015 Annual Collection of Building Data will be accessible.
B013-15 03/18/2015 2015 Annual Collection of Building Data (See WAC 392-117-020 regarding district reporting responsibilities) Beginning Monday, April 6 through Friday, May 15, school districts must complete the 2015 Annual Collection of Building Data.